🇺🇸 USC
Home & Construction
🪨

Stone Calculator

Tons and cubic yards of crushed stone for a driveway, path or base

✅

Last updated October 2026

Method: Volume is length × width × finished depth, converted to cubic yards by dividing cubic feet by 27. Tons are cubic yards × an adjustable density: 1.4 tons per cubic yard for loose clean stone (within the 2,700 to 3,000 lb per loose cubic yard the U.S. Army's FM 5-434 lists for dry gravel), 1.9 for compacted crusher run (Ohio DOT's 3,800 lb per compacted cubic yard for Item 411 crushed stone) and 1.5 for loose stone dust.

Included: Square footage, cubic feet, cubic yards, tons and pounds, an optional 10% waste allowance, 50 lb or 0.5 cu ft bag counts, coverage per ton, tons at other depths, and a reference table of common stone grades (#57, #411, #8, #2/#3, stone dust).

Not included: Separate base and sub-base layers (run each layer on its own), edging, fabric, delivery fees and your quarry's exact density. Results are estimates, not a quote.

🪨 Area, depth & stone

Stone type

2,800 lb per cubic yard, about 104 lb per cubic foot.

Waste allowance
Bag size

🚚 Stone to order (incl. 10% waste)

6.84tons
4.89 cubic yards · #57 crushed stone at 1.40 t/yd³
Exact weight
6.22 tons
12,444 lb
Exact volume
4.44 yd³
120.0 cu ft
Area
360 sq ft
4.0" deep
Bags (with waste)
274
50 lb bags

📐 Coverage check

At 4.0 inches and 1.40 tons per cubic yard, one ton of this stone covers about 58 sq ft. Your 360 sq ft area therefore needs 6.22 tons before waste and 6.84 tons with 10% added for spillage and uneven ground.

🛒 Order summary

Exact tons
6.22 t
Exact cubic yards
4.44 yd³
Order by weight (+10%)
6.84 t
Order by volume (+10%)
4.89 yd³

Bulk crushed stone is usually quoted per ton; some yards quote per cubic yard. Order in the unit your supplier uses. Bagged: 249 50 lb bags exact, 274 with 10% waste.

📋 Tons at other depths

Same 360 sq ft footprint and 1.40 t/yd³ density, at the depths people most often use:

DepthCubic yardsTonsTons +10%
2"2.223.113.42
3"3.334.675.13
4"4.446.226.84
6"6.679.3310.27
8"8.8912.4413.69

🔍 Common crushed stone sizes

GradeSizeTypical use
#57 crushed stone1" down to about 3/16"Driveway top layer, drainage, concrete mix
#411 / crusher run#57 stone plus finesCompacted base under driveways and pavers
#8 crushed stone3/8" down to about 3/32"Walkways, paver leveling, chip seal
#2 / #3 large stone1" to 2 1/2"Entrance drives, drainage, erosion control
Stone dust / screeningsFines, about 1/4" and smallerPaver setting bed, fill between stones

Size numbers follow the AASHTO M 43 / ASTM D448 standard sizes used by state DOTs and quarries (#57: 1 in. to No. 4 sieve; #8: 3/8 in. to No. 8; #3: 2 in. to 1 in.; #2: 2 1/2 in. to 1 1/2 in.). #411 and stone dust are regional product names, so confirm the gradation with your supplier.

Estimate only, not a quote. Volume is length × width × depth ÷ 27; tons are cubic yards × the density you entered. Crushed stone density varies with grade, moisture and compaction, so real loads can differ by 10% or more. Confirm tonnage with your supplier before ordering.

Stone calculator: how many tons of crushed stone do you need?

A stone calculator turns the length, width and depth of your project into cubic yards and tons of crushed stone. A 30 ft × 12 ft driveway at 4 inches deep needs 4.44 cubic yards, which is about 6.22 tons of #57 stone at 1.4 tons per cubic yard, or roughly 6.84 tons once you add 10% for spillage and uneven ground.

That is the whole job of this crushed stone tonnage calculator: give it a footprint and a finished depth, pick the grade you are buying, and read off the tons to order. Quarries sell crushed stone by the ton far more often than by the cubic yard, which is why tons lead the result; cubic yards, cubic feet and the bag count sit right underneath.

How the calculation works

Every stone estimate is two steps: a volume, then a conversion of that volume to weight. The volume step is:

Cubic yards = (Length ft × Width ft × Depth in ÷ 12) ÷ 27

Length and width are measured in feet, depth in inches (divided by 12 to become feet), and the cubic feet are divided by 27, because a cubic yard is a 3 ft × 3 ft × 3 ft cube. The weight step multiplies those cubic yards by the density of the stone:

Tons = Cubic yards × Density (tons per cubic yard)

Loose crushed stone such as #57 runs about 1.4 tons per cubic yard, which is 2,800 lb per cubic yard or about 104 lb per cubic foot, inside the 2,700 to 3,000 lb per loose cubic yard the U.S. Army's earthmoving manual (FM 5-434) gives for dry gravel. Compacted stone is heavier, because rolling squeezes out the air between the pieces: the Ohio Department of Transportation converts crushed stone in its Item 411 base at 3,800 lb (1.9 tons) per cubic yard compacted in place, and that is the calculator's crusher run preset. Because the exact number depends on the quarry, the moisture in the pile and how the load was measured, the density field is fully editable: type in whatever your supplier quotes and the tons update instantly.

Worked example: a 30 ft × 12 ft driveway at 4 inches

Say you are re-stoning a single-car driveway that measures 30 ft long by 12 ft wide, and you want a fresh 4-inch layer of #57 stone. Start with the area: 30 × 12 = 360 sq ft. Convert the depth: 4 ÷ 12 = 0.333 ft. Volume: 360 × 0.333 = 120 cubic feet, and 120 ÷ 27 = 4.44 cubic yards. At 1.4 tons per cubic yard that is 4.44 × 1.4 = 6.22 tons, or 12,444 lb. Add the 10% allowance and the order becomes 6.84 tons (4.89 cubic yards). If you were buying bags instead, the same job would take 249 bags of 50 lb exact, or 274 bags with the allowance, which is a clear signal that this is a bulk-delivery job.

Step Calculation Result
1. Area30 ft × 12 ft360 sq ft
2. Depth to feet4 in ÷ 120.333 ft
3. Cubic feet360 × 0.333120 cu ft
4. Cubic yards120 ÷ 274.44 yd³
5. Tons (#57 at 1.4 t/yd³)4.44 × 1.46.22 tons
6. 50 lb bags12,444 lb ÷ 50249 bags
7. Order with 10% allowance6.22 × 1.106.84 tons (4.89 yd³)

A second example: a walkway in #8 stone

Smaller stone, smaller job. A garden walkway 40 ft long and 4 ft wide at 3 inches deep is 160 sq ft × 0.25 ft = 40 cubic feet, or 1.48 cubic yards. Loose #8 stone weighs about the same as #57, so at 1.4 tons per cubic yard that is 2.07 tons (4,148 lb), and 2.28 tons with the 10% allowance. In bags, that is 83 bags of 50 lb exact or 92 bags with the allowance. At that size it is worth pricing both: a ton is 40 bags, so multiply the bag price by 40 and compare it with the delivered price per ton.

Tons of crushed stone by area and depth

This table gives the tons of loose crushed stone for common footprints at the four most-used depths, computed with the formula above at 1.4 tons per cubic yard and before any allowance. Find your square footage, read across to your depth, then add about 10% when you order:

Area 2 in 3 in 4 in 6 in
100 sq ft0.86 t1.30 t1.73 t2.59 t
200 sq ft1.73 t2.59 t3.46 t5.19 t
300 sq ft2.59 t3.89 t5.19 t7.78 t
500 sq ft4.32 t6.48 t8.64 t12.96 t
750 sq ft6.48 t9.72 t12.96 t19.44 t
1,000 sq ft8.64 t12.96 t17.28 t25.93 t
1,500 sq ft12.96 t19.44 t25.93 t38.89 t

Notice that tonnage scales exactly with both area and depth: 500 sq ft at 4 inches (8.64 tons) needs the same stone as 1,000 sq ft at 2 inches. For compacted crusher run at 1.9 tons per cubic yard, multiply any cell by 1.9 ÷ 1.4 (about 1.36), or simply pick the crusher run preset in the calculator.

Common crushed stone sizes and what they are for

Crushed stone in the US is sold by size number. The numbers come from the standard sizes of coarse aggregate in AASHTO M 43 and ASTM D448, which state DOTs and quarries use; each one names the largest and smallest piece size. The size decides what the stone is good for; the density decides how many tons a given volume weighs:

Grade Piece size Character Best for
#571" to No. 4 sieve (about 3/16")Clean, angular, almost no fines; drains freely, stays looseDriveway top layer, French drains, foundation drainage, concrete aggregate
#411 (crusher run)#57 plus stone dustStone mixed with fines; compacts into a hard, near-solid layerBase course under driveways, patios, sheds and pavers
#83/8" to No. 8 sieve (about 3/32")Small angular chips; smooth underfoot, easy to rake levelWalkways, garden paths, paver leveling, chip seal
#2 / #3#3: 2" to 1"; #2: 2 1/2" to 1 1/2"Large, heavy pieces; will not wash out, rough to walk onFirst lift on soft driveways, construction entrances, drainage ditches, erosion control
Stone dust / screeningsFines, about 1/4" and smallerFine crushed material; packs tight, holds shape when dampSetting bed under pavers and flagstone, filling joints, top dressing a base

Product names for the dense-graded mix are not standardized: #411 is also sold as crush and run, crusher run, aggregate base or road base depending on the region, and in Ohio the number matches the state DOT's Item 411, stabilized crushed aggregate. The presets set a typical density for each grade, but the right move is always to ask the yard what its material weighs per cubic yard and type that number in.

How to use this stone calculator

  1. Length and width (feet): measure the footprint at its longest and widest points. For a rough or curved area, break it into rectangles and add them, or use the Square Footage Calculator first.
  2. Depth (inches): enter the finished thickness you want. The 2", 3", 4" and 6" buttons cover most paths, patios and driveways.
  3. Stone type: tap the grade you are buying. Each preset fills in a typical density: 1.4 tons per cubic yard for loose #57, #8 and #2/#3; 1.9 for crusher run compacted in place; 1.5 for loose stone dust.
  4. Density: overwrite the preset with your supplier's number if they give one. The note under the field shows the same density in pounds per cubic yard and per cubic foot.
  5. Waste allowance: leave it on +10% for a normal order, or switch to Exact if you only want the raw quantity, for example when comparing quotes.
  6. Bag size: choose 50 lb bags (sold by weight) or 0.5 cubic foot bags (sold by volume) to see how many bags the job would take.

The result updates as you type: the tonnage to order on top, then exact weight and volume, bag count, a coverage check for one ton at your depth, and tons at other depths for the same footprint.

Who this calculator is for

  • Homeowners topping up or building a crushed stone driveway, parking pad or fire-pit area.
  • Landscapers quoting walkways, dry creek beds, French drains and drainage trenches by the ton.
  • Paver and patio installers sizing the crusher run base and stone-dust setting bed as separate layers.
  • Contractors ordering #2 or #3 stone for a construction entrance or a soft-ground first lift.
  • Anyone comparing quotes who needs the same job in tons for one supplier and cubic yards for another.

Key terms explained

  • Ton: in this calculator a US short ton of 2,000 lb, the unit quarries and landscape yards quote for bulk stone.
  • Cubic yard (yd³): a 3 ft cube, equal to 27 cubic feet, the other common bulk unit.
  • Density: the weight of a cubic yard of stone. It links the volume you measured to the tons you pay for, and it is the number most likely to differ from the default.
  • Fines: the dust and very small particles in a crushed product. Clean stone (#57, #8) has almost none; crusher run and screenings are full of them, which is why they compact and weigh more.
  • Loose vs. compacted: stone in a truck or pile is loose; after spreading and rolling it is compacted and weighs more per cubic yard. The crusher run preset already uses a compacted density.

How much area does a ton of stone cover?

Coverage is the tonnage question turned around, and it is handy when a supplier says "you will need about five tons" and you want to check. One cubic yard covers 27 cubic feet divided by the depth in feet, and one ton covers that area divided by the density:

Depth Sq ft per cubic yard Sq ft per ton, loose #57 (1.4) Sq ft per ton, compacted crusher run (1.9)
1 inch324231171
2 inches16211685
3 inches1087757
4 inches815843
6 inches543928
8 inches40.52921

Denser material covers less per ton: compacted crusher run at 1.9 tons per cubic yard covers about 26% less area per ton than loose #57, because each ton fills a smaller volume.

Density: tons, pounds and cubic yards side by side

Because the density field accepts any value, it helps to see what common figures mean in other units. Each row converts one density into pounds per cubic yard, pounds per cubic foot, and the cubic yards you get per ton:

Tons per yd³ Lb per yd³ Lb per cu ft Yd³ per ton Tons in 5 yd³
1.32,60096.30.7696.5
1.4 (loose clean stone)2,800103.70.7147.0
1.5 (loose stone dust)3,000111.10.6677.5
1.63,200118.50.6258.0
1.73,400125.90.5888.5
1.83,600133.30.5569.0
1.9 (compacted crusher run)3,800140.70.5269.5

On the 30 ft × 12 ft driveway from the worked example, the same 4.44 cubic yards is 5.78 tons at 1.3, 6.22 tons at 1.4, 6.67 tons at 1.5 and 8.44 tons at 1.9 tons per cubic yard. A density guess that is off by 0.1 moves a driveway-sized order by close to half a ton, which is why the field is editable.

Building a driveway in layers

A crushed stone driveway that lasts is rarely one layer. A common build is about 4 inches of compacted #411 crusher run as the base, then 2 to 3 inches of #57 on top; on soft or wet ground a first lift of #2 or #3 stone may go underneath. Each layer has its own depth and density, so run the calculator once per layer and add the results. For the 30 ft × 12 ft driveway: a 4-inch compacted crusher run base at 1.9 tons per cubic yard is 4.44 cubic yards or 8.44 tons, and a 2-inch top of loose #57 at 1.4 is 2.22 cubic yards or 3.11 tons, for 11.56 tons in total and about 12.71 tons with the 10% allowance. Compact each layer before the next goes down. If the finished surface will be poured rather than left as loose stone, size the base here and the slab with the Concrete Calculator.

Factors that change the result

  • Depth: the most sensitive input, because it multiplies the volume directly. Going from 3 to 4 inches on the example driveway raises the stone from 4.67 to 6.22 tons; going to 6 inches takes it to 9.33 tons.
  • Area: length and width set the footprint. A tape-measure error of one foot on a 12-foot width is an 8% error in the whole order.
  • Density: changes the tons but never the cubic yards. It matters whenever you buy by weight, and it is the input that varies most between suppliers.
  • Loose vs. compacted: a compacted base needs more tons per cubic yard of finished depth than loose stone; that is why crusher run uses 1.9.
  • Sub-grade condition: soft, wet or rutted ground swallows stone before you reach the finished depth, sometimes more than the 10% allowance covers.

Practical tips

  • Order in the supplier's unit. Most quarries sell by the ton; some landscape yards sell by the cubic yard. Quote the matching number and you avoid rounding disputes at delivery.
  • Keep the 10% allowance on for any real order. Switch it off only to compare bare quantities between quotes.
  • Ask for the density in writing. The scale ticket shows the delivered weight, so knowing the tons per cubic yard lets you check that the load matches the volume you need.
  • Compare bulk and bags properly. A ton is 40 bags of 50 lb: multiply the bag price by 40 and compare it with the delivered price per ton, including the delivery fee.

Limitations and assumptions

  • It assumes a level, rectangular area at one uniform depth. Slopes, dips and odd shapes need averaging or splitting into rectangles.
  • Density is an estimate. The presets are typical values; the actual weight of a cubic yard depends on the quarry, gradation, moisture and compaction.
  • It calculates one layer at a time. Multi-layer driveways and paver bases need a separate run for each material.
  • The 10% allowance is a general figure for spillage and uneven ground; very soft sub-grade or a rough existing surface can need more.
  • Delivery charges, edging, geotextile fabric, labor and equipment are not included.

Related calculators

Use this stone calculator when the material is crushed, angular stone sold by grade number and priced by the ton. Reach for the Gravel Calculator when you are buying rounded or washed gravel such as pea gravel and want cubic yards as the headline figure; the volume math is identical, but the density presets and the focus differ. For a patio, the Paver Calculator sizes the pavers, base gravel and sand together, and the Sand Calculator converts the same dimensions at sand's own density. The Cubic Yard Calculator handles any bulk material by volume alone, the Topsoil Calculator and Mulch Calculator cover the softer landscape fills, and the Asphalt Calculator takes over when the stone base gets a paved surface instead of staying exposed.

Sources

  • U.S. Department of the Army: FM 5-434, Earthmoving Operations (June 2000, PDF copy), Table 1-2: dry gravel 2,700 to 3,000 lb per loose cubic yard.
  • Ohio Department of Transportation: Construction and Material Specifications, Item 411 Stabilized Crushed Aggregate (3,800 lb per cubic yard for crushed stone, compacted in place).
  • Federal Emergency Management Agency: Appeal decision on gravel road quantities (1.4 tons per cubic yard for uncompacted gravel at 104 lb per cubic foot, against 140 lb per cubic foot for compacted Class A crushed stone in the Iowa DOT Design Manual).
  • AASHTO M 43 / ASTM D448, standard sizes of coarse aggregate (size 57: 1 in. to No. 4; size 8: 3/8 in. to No. 8; size 3: 2 in. to 1 in.; size 2: 2 1/2 in. to 1 1/2 in.), as adopted in state DOT specifications.
  • National Institute of Standards and Technology: NIST Handbook 44 (2026), Appendix C (PDF) (27 cubic feet = 1 cubic yard, 2,000 pounds = 1 short ton).

⚠️ Common mistakes & edge cases

Entering depth in feet instead of inches

Depth goes in as inches and is divided by 12 inside the formula. Typing 4 feet when you mean 4 inches produces an order 12 times too large; the reverse leaves you with a twelfth of what you need. Check that the depth field shows a small number.

Using loose density for a compacted base

Loose #57 at 1.4 tons per cubic yard and compacted crusher run at 1.9 differ by 36% on the same volume. On a 4.44 cubic yard driveway base that is 6.22 versus 8.44 tons. Pick the matching preset or type the supplier's figure.

Switching off the allowance for a real order

The exact figure is for comparing quotes, not for ordering. Spillage, soft spots and uneven ground eat into the pile, so an exact order often comes up short and triggers a second delivery fee.

Sizing a two-layer driveway as one layer

A 4-inch crusher run base plus a 2-inch #57 top is not the same as 6 inches of #57: the layers have different densities and one of them is compacted. Run each layer separately and add the tons.

Confusing a ton with a tonne

This calculator uses the US short ton of 2,000 lb, the unit American quarries quote. A metric tonne is 2,204.6 lb. If a spec sheet or an imported product lists tonnes, the difference is about 10% and it adds up on a large order.

Note: This calculator gives an estimate, not a quote. Crushed stone density and compaction vary, so confirm exact tonnage with your supplier and keep the 10% allowance on when you order.

❓ Frequently asked questions

How many tons of crushed stone do I need?

Multiply length by width in feet to get square feet, multiply by the depth in feet (inches divided by 12) to get cubic feet, divide by 27 for cubic yards, then multiply by the stone's density in tons per cubic yard. A 30 ft x 12 ft driveway at 4 inches deep is 360 sq ft x 0.333 ft = 120 cubic feet = 4.44 cubic yards, which at 1.4 tons per cubic yard of loose #57 stone is about 6.22 tons. Add 10% for spillage and uneven ground and you would order about 6.84 tons.

How many tons is a cubic yard of crushed stone?

Loose stone weighs about 1.35 to 1.5 tons per cubic yard: the U.S. Army's earthmoving manual (FM 5-434) lists dry gravel at 2,700 to 3,000 lb per loose cubic yard, and this calculator uses 1.4 tons (2,800 lb) for clean crushed stone such as #57. Compacted base is much heavier: the Ohio Department of Transportation converts crushed stone in its Item 411 base at 3,800 lb, or 1.9 tons, per cubic yard compacted in place. Because the figure depends on the quarry, gradation and moisture, you can type in your supplier's exact density.

How much area does a ton of stone cover?

At 1.4 tons per cubic yard (loose #57), one ton covers about 116 sq ft at 2 inches deep, 77 sq ft at 3 inches, 58 sq ft at 4 inches and 39 sq ft at 6 inches. Compacted crusher run at 1.9 tons per cubic yard covers about 26% less: roughly 85, 57, 43 and 28 sq ft. Coverage falls in direct proportion to depth, so doubling the thickness halves the area a ton covers.

What is #57 stone?

#57 is the most common all-purpose crushed stone. Under the AASHTO M 43 / ASTM D448 standard sizes it runs from 1 inch down to the No. 4 sieve (about 3/16 inch), with almost no fines. It drains well, spreads easily and is used for driveway top layers, French drains, drainage around foundations and as coarse aggregate in concrete. It does not lock together as tightly as crusher run, so it is usually laid over a compacted base.

What is the difference between #57 stone and #411 crusher run?

#57 is clean crushed stone with no fines, so it stays loose and drains freely. #411 (often called crusher run or crush and run) is #57-sized stone mixed with stone dust; the fines fill the voids so the material compacts into a hard, stable layer. Use #411 for a base under a driveway, patio or pavers and #57 as a top or drainage layer. Compacted in place, crusher run weighs about 1.9 tons per cubic yard (Ohio DOT's factor for Item 411 crushed stone), against about 1.4 for loose #57.

What is #8 stone used for?

#8 crushed stone is a smaller size: under AASHTO M 43 it runs from 3/8 inch down to the No. 8 sieve (about 3/32 inch). Its small angular pieces make a smooth walking surface, so it is popular for walkways, garden paths and dog runs, and it is a common choice for leveling under pavers and for chip-seal surfaces. Loose, it weighs about the same per cubic yard as #57.

Should I add 10% waste to my stone order?

Yes, for almost every job. Some stone is lost to spillage at the pile, some disappears into soft sub-grade, and uneven ground needs more than a flat calculation assumes. A 10% allowance covers that on a typical level area; very soft ground needs more. For a compacted crusher run base, use the compacted density (the calculator's 1.9 preset) so the extra weight of compaction is already counted, then add the 10% on top. Running short means paying a second delivery fee.

How many 50 lb bags of stone are in a ton?

A US ton is 2,000 lb, so it takes exactly 40 bags of 50 lb to make one ton. A cubic yard of loose crushed stone at 1.4 tons (2,800 lb) needs 56 bags of 50 lb. Bags make sense for a small path or a few square feet of drainage, but for a driveway of several tons bulk delivery is usually far cheaper; compare by multiplying the bag price by 40 and setting it against the delivered price per ton.

How deep should crushed stone be for a driveway?

A common build is in layers: a compacted base of crusher run about 4 inches thick, sometimes over larger #2 or #3 stone on soft ground, then a top layer of #57 stone 2 to 3 inches thick. Run the calculator once for each layer at its own depth and density and add the tonnages. Your local code, soil and traffic decide the final design, so ask the supplier or a contractor what works in your area.

How do I convert tons of stone back to cubic yards?

Divide the tons by the density in tons per cubic yard. At 1.4 tons per cubic yard, 10 tons of loose #57 stone is 10 / 1.4 = about 7.14 cubic yards. At 1.9 tons per compacted cubic yard, 10 tons of crusher run makes about 5.26 cubic yards of finished, compacted base. Because the density is an estimate, the cubic yards you get back are an estimate too.

Is a stone calculator the same as a gravel calculator?

They use the same volume math (area x depth / 27 = cubic yards), but this stone calculator is built around tonnage: it puts tons first, lets you type any density, and lists the common crushed stone grades (#57, #411, #8, #2/#3, stone dust). The Gravel Calculator on this site is aimed at rounded and washed gravel and headlines cubic yards. Use whichever matches the material your supplier sells.

How much stone do I need for a 12x12 area?

A 12 ft x 12 ft area is 144 sq ft. At 1.4 tons per cubic yard it needs about 0.89 cubic yards (1.24 tons) at 2 inches deep, 1.33 cubic yards (1.87 tons) at 3 inches and 1.78 cubic yards (2.49 tons) at 4 inches. Add roughly 10% to whichever depth you choose for spillage and uneven ground.

How accurate is this crushed stone calculator?

The volume part (length x width x depth / 27) is exact for a level, rectangular area. The tonnage is an estimate, because the true weight of a cubic yard of crushed stone depends on the grade, how much moisture it holds and how tightly it packs; the Army manual alone gives a spread of about 11% for dry gravel. Treat the cubic yards as reliable and the tons as a close approximation, and use your quarry's stated density for the final order.

Can I use this calculator for a circular or odd-shaped area?

Yes, by converting the shape to square feet first. For a circle use 3.1416 x radius squared, for a triangle use half the base times the height, and for an L-shape split it into rectangles and add them. Then enter the total area as a length and width that multiply to that figure (for example 100 sq ft as 10 x 10) and set the depth as usual. The Square Footage Calculator on this site handles the area step.

💡 Good to know

Stone is sold by the ton, so density decides the order

The cubic yards never change once you have measured, but the tons you pay for scale directly with density. 1.4 is a fair figure for loose clean stone and 1.9 for a compacted crusher run base; the number on your quarry's price sheet is better. Type it in.

Clean stone drains, stone with fines compacts

#57 and #8 have almost no dust, so water runs through them and they stay loose. #411 crusher run and stone dust are full of fines, so they lock into a hard layer. Pick the grade for the job first and let the calculator set the density.

One ton covers about 58 sq ft at 4 inches

That figure (loose stone at 1.4 tons per cubic yard) is enough to sanity-check most driveway quotes on the spot: divide your square footage by 58 and you have the tons before the allowance. For a compacted crusher run base, divide by about 43.

Related Calculators